Graphs over time of identified Needs/Resources
Appearance
Graphs Over Time of Identified Needs/Resources
[edit | edit source]Following a connection circles activity, this script aims to collect more information on the nature of links between needs (including delays, order of delays, magnitude).
Steps:
Status
[edit | edit source]Under Development
Primary nature of group task
[edit | edit source]Convergent
Time
[edit | edit source]Preparation time: 15 minutes
Time required during session: 45 minutes
Follow-up time: 0 minutes
Materials
[edit | edit source]- Camera or other method to capture the graphs
- White Board
- White Board markers
Inputs
[edit | edit source]Connection Circles artifact
Outputs
[edit | edit source]Set of graphs describing the links between variables.
Roles
[edit | edit source]- Facilitator who has some experience with SD to work with the group
- Modeler who listens to what is being graphed and the way people are talking about the graphs, and who is also be able to conceptualize the early seeds of system structure
- Wall-builder with little or no experience in SD who will cluster graphs and talk about themes
- Recorder to document the session and photograph the clustered graphs
- Runner (optional) to bring the graphs from the community facilitator if the group is large
Steps
[edit | edit source]- Keep the same groups as from the connection circle exercise.
- The modeling team assigns each group to a different wall within the room.
- The facilitator gives an example of how to set up the graph over time, carefully labeling X-axis “Time” and designates the units of time (probably weeks, but could be days or months as appropriate). The Y axis is a scale from High (100) to Low (0) impact. Just to the right of the Y axis is dotted “shock” line.
- The facilitator demonstrates the process for drawing these graphs. They select one starting need, which will be the “shock”. They explain that the dotted line represents a time when there is a shock in the starting need (i.e. if the need is housing, the shock will be losing housing, if the need is physical health the shock will be a physical health crisis). For each set of paired needs (Housing – physical health; housing-mental health; etc.), the group will draw a shape of the impact of a housing shock on that variable over time.
- The facilitator then asks participants to graphs for each of the shocks, drawing lines for each paired need.
- The facilitator and wall-builder walk around and help participants with the task if they need it. Allow 15 minutes or until the group runs out of steam to complete the task.
Evaluation Criteria
[edit | edit source]Graphs that show order of delay, length of delay, intensity of impact
Authors
[edit | edit source]Koko Zhou, Sophie Cheng, Allison Simpson, Ellis Ballard
History
[edit | edit source]First described in October 2017 at the Social System Design Lab
Revisions
[edit | edit source]None
References
[edit | edit source]None
Notes
[edit | edit source]None