SAP ERP/EM
Appearance
< SAP ERP
SAP Event Management
[edit | edit source]SAP's standard, on-premise, solution for process and object track and trace functionality.
Businesses today can operate in a highly distributed, outsourced and networked environment. Globalization is upon us which means that we have to be more intelligent with the way that we operate. We have to collaborate efficiently and effectively. We need to ensure that regulations are enforced during the entire process. How do we do that?
- We need to track and trace our products and processes across the supply chain measuring performance and proactively reacting to deviations to the plan in real time.
- We need complete visibility of our end-to-end processes across all the geographical and partner boundaries.
- We need the ability to quickly adapt to changing conditions in our process.
- We need to head off issues before they become an issue...
Overview
[edit | edit source]- SAP Event Management (SAP EM) is an application within the component SAP SCM that belongs to the mySAP Supply Chain Management solution. SAP EM can be connected to other mySAP Business Suite components such as SAP R/3, SAP CRM, and SAP BW. It can also be connected to non SAP systems using BAPI or XML / XI calls. IDocs are also a popular way to get data to your SAP EM system.
- With the SAP Event Management application your company can monitor and manage events across your distributed processes involving partners, inventories and assets. It captures events from your system and your partners systems, analyzes them against it's predefined plan and alerts or workflows a response to the required people to react of deviations are found. It comes integrated with SAP NetWeaver BI and SAP Auto-Id Infrastructure (RFID enabled scenarios).
Key Points
[edit | edit source]- Provides monitoring capability (visibility) to any business process
- Partners - See how your partners are performing and react to deviations to planned partners performing certain events in your process
- Locations - If your process is intended to have Event A end up at Location A but it arrives at location B then raise exception!!
- Measurements - You're transporting frozen goods from point A to point B and the temperature must not go above 10 deg. If it arrives at point B at 11 deg then raise exception!!!
- Tracks status changes to YOUR business processes
- Matches the planned process with the actual process (TO UNCOVER EXCEPTIONS)
- Real time notification of events
- Alert framework
- Workflow engine
- 2 Types of events:
- Those that you expect to happen (the plan)
- Those that actually happen (the actual)
- Regular event => Events that occur within the planned period
- Early / Late event => Events occurring outside the planned period
- Unexpected event => Events that you never planned for
- Unreported event => Event that you expected to occur but never did
- Manage the sequencing of your events
- Provides both operational and analytical reporting capabilities
- Operational => Web GUI application - Where are my issues now?
- Analytical => SAP NetWeaver BI integration - How well did I do and where are my improvement points?