Transportation Deployment Casebook/2018/Another Type of Technology Here
Jump to navigation
Jump to search
Introduction
[edit | edit source]Technology
[edit | edit source]Market
[edit | edit source]Life Cycle Analysis
[edit | edit source]Birth Phase
[edit | edit source]Policies
[edit | edit source]Environmental policy
[edit | edit source]Growth Phase (2011-2017)
[edit | edit source]Maturity Phase (2018 - future)
[edit | edit source]Quantitative
[edit | edit source]Where:
· S(t) is the status measure (mileage for each year)
· t is time in year
· t0 is the inflection time (year in which ½ k is achieved)
· K is the saturation status level
· b is a coefficient
K and b are to be estimated through the regression analysis
In addition, the equation 1 is derived into a linear form to estimate the value K, b and t0. The equations are shown are follow.
y = bX + c (2)